Schedule Announcements (UPDATED)

Post date: Jan 27, 2012 3:48:15 PM

Please review the following Schedule items that have been recently updated

  • Week 4 on the day of your lab (1/30 - 2/3): Optimized turntable performance with ball on tube

    • Demonstrate the best 180 degree rotation with ball staying on tube. TAs will inspect code for proper output of settling time. This time will be the final turntable performance used for grading the hardware performance.

  • Turn Table Reports Due Friday 2/3 by 8pm in Design Studio Bin (see Turn Table Report as end of page)

  • Robot Team Kickoff. Sign up for time slot in Design Studio sheet. To be completed between Thursday 2/2 and Tuesday 2/7 by 8pm

      • To form a robot team email Yoshio, ytsuruta@gmail.com, with team member names AND section time (e.g. Monday pm).

      • Sign up for your meeting with TAs, which is when you will get your robot kit. DO THIS SOON TO GET A SPOT THAT WORKS FOR YOUR TEAM.

    • If you do not form a team by Tuesday midnight January 31, we will team for you.